For the Palace the intervention provided the recovery of various architectural elements, stairs, railings, wood frames, wall finishings through the specific recovery techniques. The recovery work has been entrusted to local artisans.

In the Casaccia building , which is not subject to protection of the Minister of Fine Arts, the choice was much freer with respect to the local traditions, combining traditional materials with innovative systems, realizing unique apartments, each with different details and features. The energy performance index of the overall project is Epi = 88.29 kWh / m² year. National Energy Class E.

More about our real estate proposal?
SEE OUR
APARTMENT
PLANS
DOWNLOAD
THE CONTRACT
(pdf)
About us
Contacts